MassDOT Unveils Early Plan to Replace New Bedford-Fairhaven Bridge

The new bridge would take less time to open and close for boat traffic than its 120-year-old predecessor, but a preliminary design revealed last week has left many uninspired

A rendering of the new bridge would replace the 120-year-old bridge connecting New Bedford and Fairhaven.
A rendering of the new bridge would replace the 120-year-old bridge connecting New Bedford and Fairhaven.
MassDOT
Share
A rendering of the new bridge would replace the 120-year-old bridge connecting New Bedford and Fairhaven.
A rendering of the new bridge would replace the 120-year-old bridge connecting New Bedford and Fairhaven.
MassDOT
MassDOT Unveils Early Plan to Replace New Bedford-Fairhaven Bridge
Copy

During the day, traffic on the New Bedford-Fairhaven bridge comes to a halt once an hour.

The 120-year-old steel bridge slowly spins 90 degrees until it’s perpendicular to the road, opening up a pair of narrow channels on both sides for fishing boats and barges to squeeze through.

Cars don’t start moving again until the bridge groans back into place. The whole process stops traffic for an average of about 12 to 23 minutes depending on how many boats are steaming by, according to a recent navigational study submitted to the Coast Guard.

The Massachusetts Department of Transportation is now developing a detailed proposal for a bridge replacement before legislators go back to the governor to ask her to issue the bond.

Last Thursday, MassDOT officials presented a bare bones rendering of the type of bridge they want to build. A pair of new steel towers would essentially lift a stretch of road up like an elevator. The new vertical lift bridge would open faster than the current swing bridge and create a navigational channel that’s twice as wide, enabling boats to pass through faster and traffic to get moving sooner.

This story was reported by The Public’s Radio. You can read the entire story here.

The House approved a Trump administration plan to rescind $9 billion in previously allocated funds, including $1.1 billion for the Corporation for Public Broadcasting
Rhode Island inspections cited hospital for improper use of physical restraints, seclusion
FEMA program has funded modeling tool to identify flood risks in Rhode Island’s coastal and inland waters
Findings show Ocean State improved in latest ranking of most expensive states to find housing
Other legislative panels prepare to study Pawtuxet River flooding, Central Falls schools
The council voted last month to eliminate the funding Zeiterion gets from the city, which accounts for about 20% of the theater’s operating revenue. But at the mayor’s request, the council will vote Thursday, July 17 on whether to restore it. If the funds aren’t restored, it could threaten the existence of the 102-year-old venue